Date
Fri, 17 Jun 2022
Time
10:00 - 11:00
Location
L4
Speaker
David Porter (Carbon Limiting Technologies), Chris Breward, Daniel Alty (Peel Ports; joining remotely)
Organisation
Peel Ports

Peel Ports operate a number of locks that allow ships to enter and leave the port. The lock gates comprise a single caisson structure which blocks the waterway when closed and retracts into the dockside as the gate opens. Build up of silt ahead of the opening lock gate can prevent it from fully opening or requiring excessive power to move. If the lock is not able to fully open, ships are unable to enter the port, leading to significant operational impacts for the whole port. Peel ports are interested in understanding, and mitigating, this silt build up. 

Please contact us with feedback and comments about this page. Last updated on 07 Jun 2022 14:21.